PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

023 (800x600).jpg 024 (800x600).jpg Backfill inside the radius at the Monumental Stairs Facing East (800x600).jpg Bolting Derrick -2 Facing North (800x600).jpg Bolting Derrick -2 Facing West (800x600).jpg Compacting 2 lift along foundation walls at column line 1 from G.1-E.3 Facing North-East(800x600).jpg Compacting aroung Monumental Stair radius Facing North-West (800x600).jpg Installing Metal deck angles at Elev. 4,5 (3rd Floor) Facing South East (800x600).jpg Metal Deck angles at Elev. 4,5 (3rd Floor) Facing East (800x600).jpg
Previous pageNext page Bolting Derrick -2 Facing West (800x600)
Bolting Derrick -2 Facing West (800x600)